 |

Ok, it is now time to plumb the pool and ready it for back-filling the hole around it.
You or your dealer will drill 2-4 2" inch holes for the returns, and optional light or automatic cleaner.
If you ever plan on installing an automatic cleaner, go ahead and plumb for it now.
It can always be added later.
Plumbing is as simple as gluing any PVC pipe.
Material to connect the pool and power to the filter for both the electrical and plumbing will need to be purchaced for DIY kits.
This can take 3-5 hours.
You will also start filling the pool.
Each pool has a level to which it can be filled with water with no backfill around it.
If you use a fire hydrant or a water truck, filling is fast.
The water must remain about 12" higher than the surrounding backfill.
This helps maintain the shape of the pool.
Trilogy Pools that require extra strength are built using a sandwich core construction.
This significantly reduces the task of putting in the pool.
|
 |
 |
|