 |

Rough grade is easily done with the right tools.
You can either rent a small Bobcat with a landscape box, or hire someone to prepare your yard.
In either case, you will want to be sure that the pool is at a local high point in the yard.
Be sure that all of the ground around your pool slopes away from the pool.
Typically you want 2"-6" of rise at the pool edge, relative to the surrounding area.
This allows rain water to drain away from the pool.
If you made it this far in a day, you are ready for a good night's rest.
At a slower pace, you could easily be here by the end of day 2.
If three days have past, you probably were distracted by lots of unrelated details.
If you had a dealer install your pool, this seemed to happen at light speed and you are wondering why you didn't do it yourself (call the guys up that finished in a day if you question your decision).
At any rate, your pool will be clean in a day or so and you are ready to swim.
Now, what are we going to do about all of this mud?
|
 |
 |
|